RAGBRAI LI Day Passes are still available!

Reply To: What is the issue around town shut down times?

kennethfblue, January 24, 2022 at 6:03 pm

I have ridden 9 ragbrais and last year was the first time i was confronted with early shutdowns. I usually do the karras loop and last year arrived at the karras patch handout location a little before shutdown. the thing i found most annoying was the police shut the place down and couldn’t get any hydration either alcoholic or non alcoholic after riding the loop late in the afternoon (for me it was 117 mile day) and not seeing any refreshment stop along the way on the loop. did manage to find a water spigot and got some water after police closed the location. this is a problem when the loop is near the end of the daily ride instead of the middle of the daily ride. as far as the other early shutdowns i experienced last year. no big deal just couldn’t get food.

#1349505 |

Categories

RAGBRAI L – 2023

RAGBRAI XLIX – 2022

RAGBRAI XLVIII – 2021

Training

Gatherings & Meetings

Lost and Found

Miscellaneous

Clubs, Teams & Charters